Construction supervision

Construction supervision

Long-term experience. Significant state and municipal projects throughout Latvia.  Customer’s trust. Competent and industry-recognized professionals. Experience working with NATO standards.

WE OFFER

  • Construction supervision of streets, roads and highways,
  • Construction supervision of runways, taxiways and aprons,
  • Construction supervision of helipads,
  • Construction supervision of parking lots, recreation areas and squares,
  • Construction supervision of bridges, overpasses and pedestrian bridges.

 

Objekti Gads
1. Development of regional-scale cycling infrastructure along route V7: Riga (city border) – Marupe – Jaunmarupe, section of Vecozolu Street and Rozu Street 2025.
2. Reconstruction of the intersection of Lubanas Street and Rembates Street in Riga 2024.
3.  Construction of a pedestrian walkway along Ziedkalnu Street and Mazcenu Avenue from Loka Road to Marupe Music and Art School 2023.
4. Reconstruction of the Bebru and Gaujas Street intersection and construction of a parking lot

 

2021.
5. “Construction of a shooting range at the Skrunda Training Area, “Mezaine”, Ranki Parish, Skrunda Municipality 2020.
6. Construction supervision of the reconstruction of Rupnicu Street in the city of Olaine 2019.
7. Reconstruction of Gerberu Street sports area in Marupe 2018.
8. Construction supervision of reconstruction of State Segional Road P20 “Valmiera-Cesis-Drabezi” section km 29.52 – 39.73 2017. – 2018.
9. Reconstruction of the section of Gaujas Street from Krasotaju Street to Atmodas Street in Smiltene 2017. – 2018.
10. Construction supervision of reconstruction of Juglas and Bikernieku Street intersection, Riga 2017.
11. Supervision of road construction works at the “Adazi National Training Centre” in Kadaga, Adazi Municipality 2016. -2018.
12. Construction supervision of the reconstruction of Liela Street, section from Daibes Street to Karla Ulmana Avenue 2015. -2016.
13. Reconstruction of road A2 “Riga – Sigulda – Estonian border (Veclaicene)” (both carriageways), section km 15,4 – 25,50. Bridge construction supervision 2015.
14.  Construction supervision of pavement reconstruction works on State main road A12 Jekabpils–Rezekne–Ludza–Russian border (Terehova), section from km 83.00 to km 96.60 2015.
15. Construction supervision of the construction of the East Highway intersection with Gaujas Street (the continuation of the existing traffic transmission at Vairoga Street). 2014. – 2015.
16. Construction supervision of Stage 1 construction works of the Northern Pier – Phase 5 of the passenger terminal expansion at Riga International Airport 2013. – 2015.
17. Construction supervision of reconstruction of road E22 section Tinuzi – road P32 (road P80 km 5,12 – 40,6) 2012. – 2013
18.  Construction supervision of Stage 3 of the Southern Bridge (section from Bauskas Street to Ziepniekkalna Street) 2012. – 2013.
19.  Construction supervision of the reconstruction works of transit streets in Auce – Raina Street and Vitinu Street 2011.
CONSTRUCTION SUPERVISION AT SJSC RIGA INTERNATIONAL AIRPORT
SJSC Riga International AirportWithin the framework of the infrastructure development project, several objects were reconstructed, and new construction was carried out.We designed several of these objects (see section “PROJECTS“) and carried out author`s supervision.Construction supervision was also carried out at several airport infrastructure facilities, such as:– reconstruction of the runway pavement;
– reconstruction Apron 2 and Apron 3;
– construction of Taxiways E and D;
– construction of northern and southern de-icing/anti-icing pads.In 2014 and 2015, Riga International Airport was expanded, and The North Pier was built (Terminal Expansion Project Stage 5). Construction supervision of transportation infrastructure within the project was carried out by LLC “PRO VIA”.A new stormwater drainage system was built. An approach lighting system was modernized, taxiways were equipped with a lighting system in accordance with CAT II. Reinforcement and strengthening of the runway strip and runway end safety area.

Infrastructure facilities of Riga Airport

Objects Year
1. Construction supervision of reconstruction of Apron 2 2017. – 2018.
2. Stormwater drainage within the territory of the Business Park around the northern end of the runway 2017.
3. Construction supervision of taxiway lighting system installation compliant with CAT II requirements 2014.
4. Construction supervision of the additional high-speed taxiway D 2014.
5.  Construction supervision of runway strip and runway end safety area improvement works 2014.
6.  Construction supervision of the additional taxiway E 2013.
7. Renovation of the runway pavement 2013. – 2014.
8. Construction supervision of the Southern de-icing treatment area 2013. – 2014.
9. Construction supervision of reconstruction of Apron 3 2013. – 2014
10.  Construction supervision of the Northern de-icing treatment area 2013. – 2014.