Project: Heliport, RIX
Year: 2019. – 2020.
Concrete pavement: 5235 m2
Asphaltconcrete pavement: 1077 m2
Constructed equipment: Almost 14 km of ELT cables have been installed, along with 3 lighting masts and 73 in-pavement lights. Additionally, 1 km of EST cables and 3 km of optical fiber cables have been installed, including 2 high-resolution video surveillance cameras. A 0.5 km GRP rainwater drainage network has been constructed with one treatment unit set, as well as a 145-meter-long reinforced concrete/polymer concrete channel with F900 load class.